I-5 NCEP Weekly Look-Ahead: October 10 – October 16, 2022 Prepare for weeknight intermittent lane reductions in both directions from SR-14 to Parker Rd from 8pm to 6am to support all the below activities on I-5. Crews begin mobilizing at 6am and work hours are 7am to 4pm and 7pm to 6am on weekdays and Saturdays as needed. Gavin Canyon Undercrossing bridge foundation work, crossing over The Old Road. Prepare for work along the southbound outside shoulder behind k-rail between Calgrove Bl and Weldon Canyon Rd. Activities include auger drilling, setting of steel rebar, and concrete work. Construction access from The Old Road may be utilized. | More Information Southbound outside shoulder excavation, shoring and retaining wall work between Calgrove Bl and Weldon Canyon Overcrossing. Prepare for intermittent closures of the southbound Calgrove Bl on-and off-ramps from 7pm to 6am. Signage is posted along the detour routes and at the preceding off-ramp. | More Information Rebar, form, concrete, and falsework installation work for the Butte Canyon Bridge between Pico Canyon Rd/Lyons Ave and McBean Pkwy. | More Information Center median retaining wall construction, paving, and concrete barrier work. Activities include excavation, shoring, form, and concrete work planned to continue between SR-14 and Valencia Bl. | More Information Slope soil stabilization (soil nail installation) along outside shoulders in both directions between Weldon Canyon bridge and Gavin Canyon Undercrossing. Equipment includes a directional drilling machine, usage of trucks, forklifts, and concrete mixing support. | More Information Magic Mountain Pkwy to Parker Rd Center median work behind concrete barriers will continue between SR-126 and Parker Rd. Activities include excavation, asphalt removal, drainage pipe installation, placement of base, stock piling of material, and paving. | More Information Temporary electrical work at the northbound Newhall Ranch Rd straight on-ramp. Activities include adjustments to ramp meters, ramp lighting, and installation of temporary foundations, poles, and electrical components. | More Information
Upcoming Activity in October
Noteworthy |
|
|
|