I-5 NCEP Weekly Look-Ahead: March 20 to March 26, 2023 Prepare for weeknight intermittent lane reductions in both directions between SR-14 and Parker Rd from 8pm to 6am to support all the below activities on I-5. Crews begin mobilizing at 6am and work hours are 7am to 4pm and 7pm to 6am on weekdays, and Saturdays as needed. SR-14 to Magic Mountain Pkwy Weldon Canyon Rd bridge removal of concrete form work. One-way traffic control with a flagger will be used as needed Monday through Friday at Weldon Canyon Rd/Coltrane Av. | More Information Gavin Canyon bridge foundation steel rebar, forming and grading work along the northbound outside shoulder between Weldon Canyon Rd and Calgrove Bl. Construction access from The Old Road may be utilized. | More Information Southbound outside shoulder excavation, shoring and retaining wall work between Weldon Canyon Overcrossing and Calgrove Bl. Prepare for intermittent closures of the southbound Calgrove Bl on- and off-ramps from 7pm to 6am. Signage is posted along the detour routes and at the preceding off-ramp. Flagger controlled construction access from The Old Road at Gavin Canyon Undercrossing may be utilized. | More Information Southbound on-ramp detours:
Center median retaining wall construction and concrete barrier work. Activities include excavation, backfill, shoring, form, and concrete work between SR-14 and Magic Mountain Pkwy. | More Information Outside shoulder slope soil stabilization (soil nail installation) in both directions between Weldon Canyon bridge and Calgrove Bl. Equipment includes a directional drilling machine, usage of trucks, forklifts, and concrete mixing support. | More Information Butte Canyon bridge concrete form removal in the center median between Pico Canyon Rd/Lyons Av and McBean Pkwy, adjacent to Vista Valencia Golf Course. | More Information Magic Mountain Pkwy to Parker Rd Pile driving adjacent to the I-5 bridge at Rye Canyon Rd between The Old Road and Avenue Stanford. | More Information Castaic Creek bridge deck work in the center median between SR-126 and Hasley Canyon Rd. | More Information Electrical work at southbound SR-126 and Parker Rd on- and off-ramps. Prepare for the following nighttime ramp closures. | More Information
Installation of a concrete batch plant along the southbound I-5 ramp at SR-126. | More Information Sound wall foundation construction along southbound outside shoulder and The Old Road between Villa Canyon Rd and Hasley Canyon Rd. Activities include excavation, auger drilling, setting of steel rebar, concrete work, and material handling. Construction access from The Old Road may be utilized. | More Information Center median roadway base, paving, and concrete removal activity between Magic Mountain Pkwy and SR-126. | More Information Coming Soon Full closure of Rye Canyon Rd between The Old Road and Avenue Stanford to remove construction equipment from the work zone in late March. Additional schedule and detour information will be provided in future weekly alerts. | More Information Essential Details
Noteworthy Access to emergency responders will be maintained. Construction is a dynamic process, it is subject to weather conditions, and information is subject to change, visit the project website for the most up to date information and a weekly listing. |
|
|